Measure, analyze and improve

EnergyLok® Cooling Capacity Factor (CCF) Service

Wondering what to do next? Want to reduce cooling cost? Want to cool your equipment more efficiently? Want to better handle hot spots? Don't know where to start or what to do next? We can help!

Adhoc initiatives often yield ineffective results.  You wouldn’t build a building one room at a time without a plan for the entire project.  EnergyLok CCF Service can help you develop that plan for cooling efficiency initiatives.

Understand your potential for real savings from cooling efficiency initiatives AND identify which projects to implement based on their benefit.  Data Clean’s new EnergyLok CCF Service should be the first step in your energy efficiency implementation plan.

Leveraging over a decade of research and field experience, EnergyLok CCF Service provides you a current conditions scorecard and specific prioritized recommendations to help you save.   EnergyLok CCF Service is vendor neutral. The report and recommendations are not related to specific products or solutions.

You will LEARN:

  • How your data centre is doing versus what’s possible
    Your Data Centre Score
  • How your data centre stacks up against similar facilities
  • How potential savings are available before you change anything 
  • Contribution of savings from different efficiency initiatives

EnergyLok CCF considers and reports multiple characteristics of your data centre, including:
size, construction, available cooling, cooling need, rack and row configuration, airflow supply and return configuration, hot spots, cold spots, temperature, humidity, PUE, and more.

Want More? Want even more actionable results?
EnergyLok CCF service and reporting OPTIONS include:

  • Computational Fluid Dynamics (CFD) Modeling 
  • Infrared Thermography (IRT)
     Infrared Thermography Server Rack
  • IR/3D Modeling – The best way possible to visualize the existing cooling conditions in your data centre.  Check out this video that lets you ‘walk’ through the temperature model of your data centre.



Please contact your local Data Clean account manager to get started with your action plan.

Back to Top